Ariake Pork Plant

有明ポークプラント

With a newly developed slaughtering line and an expanded cutting line, Ariake Pork Plant has increased its number of processed pigs by approximately 40 percent since April of 2019. The introduction of state-of-the-art equipment from the EU has advanced the mechanization of such work as cleaning, de-hairing and dressing. This has not only helped improve the productivity and reduce the cost, but also led to a better hygiene and the work environment. In addition, animal welfare is duly considered when automating driving live pigs and slaughtering with carbon dioxide. Our new facility is environmentally friendly as we are now able to reduce water consumption by 40 %; as a result, the 1,000 liters of water previously required per pig was reduced to 600 liters. The Ariake Pork Plant can process up to 2,400 pigs per day.

Information

Adress6965 Noikura, Ariake-cho, Shibushi City, Kagoshima Prefecture 899-7402
TEL+81-99-474-1118
FAX+81-99-474-1117
Facilities ・Main office
・Pork processing facility
・Processing facility